IESCO New Connection Online | Online IESCO Application Form
If you’re living in Islamabad and want to apply for an IESCO new connection, it can be done by filling out an e-application form and simply submitting it. All you need to do is fill up the form and let IESCO ENC (Electricity New Connection) handle the rest of the tasks. The concerned department at pay IESCO bill initiates the application process promptly after form submission.
Feeling exhausted about the application process? Don’t worry! IESCO’s online bill system will handle it through proper channels and promptly. The online new connection service resolves the need to visit the IESCO office and stand in long queues. Just apply from your home, and the online application process enables you to track your application status online.

Application for IESCO New Electricity Meter Connection
For the online new connection application process, you have to visit the ENC (Electricity New Connection) system or the online application portal. IESCO’s new connection application form consists of 5 steps, each with its own sub-steps.
You must complete all the required fields thoroughly, ensuring that the information you provide is accurate. Please ensure you input relevant and authentic information; otherwise, your application will not be entertained. Before applying for a new connection, ensure you have the following documents
IESCO New Connection Application Form Download
You can download the IESCO application form here.
IESCO New Connection Process
For the submission of the form enable the captcha write numbers in the field and click the “Submit” button.
How to Check IESCO New Meter Connection Status
You’re provided with a tracking number right after you apply for a new connection. This tracking number will help you to check the status of IESCO’s new connection application tracking.
IESCO Demand Notice
When you submit a new connection application, the IESCO ENC team will inspect the whole application process and proceed till the end. Essentials will be monitored by the ENC team such as service line length, conductors, and other necessary equipment needed in the installation of the new meter connection. A demand notice will be issued after assessing all the required things.
“Review completed” or “Pay Demand Notice Fee” status will be shown on your application tracking page. Now, you’re able to download your demand notice voucher through the ENC portal.
How to Apply IESCO Demand Notice Online
Note
To proceed application fast pay the demand notice fee to your nearest bank.
How to Submit Demand Notice Online
After submitting the IESCO new connection fee you can apply for a demand notice application online. To apply you must have scanned a copy and paid the demand notice fee.
Note
Upon timely payment and uploading of the demand notice on the ENC portal, your new connection will be installed within 15 days according to the official procedure.
IESCO New Connection Demand Notice Fee
The fees for the demand notice are determined by both fixed and variable charges. The variable charges, in turn, rely on factors such as the length of the service line, the type of connection (single-phase or three-phase), and the location Rural or Urban.
Connections Type | IESCO New connection Charges | Amount |
---|---|---|
1 | Single Phase service connection (Rural) with 2 Core 10 sq mm PVC | |
1a | Length of service line up to and including 40 meters | 4,000 |
1b | Length of service line 41-100 meters (with one span of Ant Conductor and one pole/structure) | 4,000 + Rs.200 per meter |
1c | Length of service line 101-160 meters (with one span of Ant Conductor and two poles/structures | 16,000 + Rs.250 per meter |
2 | Single Phase service connection (Urban) with 2 Core 10 sq mm PVC | |
2a | Length of service line up to and including 40 meters | 4,000 |
2b | Length of service line 41-100 meters(with one span of Ant Conductor and one pole/structure) | 4,000 + Rs.200 per meter |
2c | Length of service line 101-160 meters (with one span of Ant Conductor and two poles/structures) | 16,000 + Rs.250 per meter |
3 | Three Phase service connections (Both Urban & Rural) with 4 Core 10 sq mm PVC | |
3a | Length of service line up to and including 40 meters | 15,000 |
3b | Length of service line 41-100 meters(with one span of Ant Conductor and one pole/structure) | 15,000 + Rs.260 per meter |
3c | Length of service line 101-160 meters (with one span of Ant Conductor and two poles/structures) | 30,600 + Rs.300 per meter |
3d | Length of service line 160-280 meters (with one span of Ant Conductor and two poles/structures) | 48,600 + Rs.340 per meter |